The cheapest incomplete bid is usually the expensive one. Four yes/no checks — a load calculation, model numbers, the duct line stated separately, commissioning in writing — and the price sitting next to them, not above them.

4 checks Manual J, models, ducts, commissioning A quote that is one number for “new system” hides the line that differs most between bidders. Completeness is not a reason to skip the licence check.

Score each bid 0–4. The tool names the most complete on paper. It does not pick a contractor and it does not rank on price. A $1,200 gap on two complete bids is a conversation. A $1,200 gap on a bid that skipped the load calculation is a different conversation.

Three bids, four checks

Yes or no. Price is optional. Nothing is emailed.

Scores
Most complete on paper
Read this

What this assumed

Completeness is not an endorsement. Check the licence. HyreHVAC does not rank contractors.

Questions this calculator answers

How do I compare HVAC quotes?
Same load calculation, same scope, equipment model numbers listed, ductwork remediation stated separately, commissioning in writing. Then the prices mean something.
What if one bid is much cheaper?
Read the four checks first. The missing line is usually ducts, a mismatched coil, or no permit. Cheap incomplete is how change-orders start.
Does HyreHVAC rank contractors?
No. Matching is still being built. This worksheet does not endorse anyone.